PROJECT PRINCIPALS' EXPRERIENCE |
|
No. |
Description |
Client (s) |
Year (s) |
|
1 |
Bulk Port Operations management in Canada, Papua New Guinea, Australia dan Indonesia |
BHP Vancouver Wharvs |
1982 - 1994 |
|
2 |
Project Management of the Red Dog Lead/Zinc transhipment facility in Alaska and Vancouver Canada |
Vancouver Wharvs |
1987 - 1989 |
|
3 |
Project and Construction management of Bulk Terminals in Indonesia, Peru and Venezuela |
Sandwell Engineering |
1989 - 2001 |
|
4 |
Coal Chain Studies in Indonesia and Venezuela |
Sandwell Engineering |
2001 - 2002 |
|
5 |
Coal Terminal Location Studies in Indonesia (barge and deep sea) |
Sandwell Engineering |
2002 - 2005 |
|
6 |
Offshore and Marine Construction, Dredging and Land Reclamation |
Total Indonesie; PT. KPC; BP Indonesia; PT. KPI; |
2002 - 2006 |
|
|
|
PT. Indominco Mandiri; PT. Arutmin; PT. Jorong |
|
|
|
|
|
|
Over thirty five years of experience in the Engineering and Design of material handling facilities for Coal, Lime, Phosphate, Platinium,Potassium, Gold, Diamonds, Uranium, Boxite, etc. |
|
|
|
|
|
|
Significant Experience |
|
|
|
7 |
Potassium Compacting Plant; Dead Sea Works Lead mechanical engineer responsible |
E.L. Bateman |
1982 - 1984 |
|
for handling design of interconnection area |
|
|
|
8 |
Oil Shale Combustion Demonstration Plant; Pama Responsible for the conceptual and mechanical |
E.L. Bateman |
1986 - 1988 |
|
|
design of the oil shale combustion demonstration plant (Material Handled-Oil Shale) |
|
|
|
9 |
New Coal Conveying Screening and Piling System for NCSC; Port Ashdod |
E.L. Bateman |
1988 - 1989 |
|
Project Engineer and Mechanical Leader (material handled - coal) |
|
|
|
10 |
Fly Ash Handling Project; Lethabo Power Station Galteng In charged for supervision and commissioning of |
E.L. Bateman |
1989 - 1990 |
|
|
the handling system (material handled - fly ash) |
|
|
|
11 |
JCI Waterval Project; Platinum Mining In charge for supervision and commissioning of |
E.L. Bateman |
1989 - 1990 |
|
mechanical equipment and materials handling system (pipe conveyors for platinum ore) |
|
|
|
12 |
Crushing and Screening Plant; Vansa Vanadium Mine - S.A. Western Territories |
E.L. Bateman |
1990 - 1991 |
|
|
Feasibility Study for crushing and screening plant, including conveyor-handling system (vanadium ore) |
|
|
|
13 |
Overland Conveyor; Majuba Colliery - Northern Transvaal In charge for modifications and commissioning of |
E.L. Bateman |
1991 - 1993 |
|
the overland conveyor 6 km length and 4 km radius of horizontal curve (material handled - coal) |
|
|
|
14 |
Sandwich Conveyors Project; Mossgas - Mossal Bay - George Area |
E.L. Bateman |
1991 - 1993 |
|
|
Design of modifications and commissioning of the sandwich conveyors system |
|
|
|
|
(material handled -pellets of magnetite) |
|
|
|
15 |
Reversible Belt Feeder and Pipe Conveyor Project; Riebeeck West - Cape Town Area |
E.L. Bateman |
1991 - 1993 |
|
Commissioning of the conveying system including a pipe conveyor for cement plant in Riebeeck West |
|
|
|
Area (material handled - coal) |
|
|
|
16 |
Pipe Conveyors; Jwaneng Botswana Diamond Mine In charge for training of the maintenance team for |
E.L. Bateman |
1991 - 1993 |
|
|
Pipe Conveyors |
|
|
|
17 |
Highly Powerful Reversible Train Pusher; Bateman's new development |
E.L. Bateman |
1991 - 1993 |
|
Inventor and mechanical leader in charge for development of the new suspension system for the |
|
|
|
train pusher-robot (1600KN draw force at both directions) |
|
|
|
18 |
Rapid Load Out Station for Buxton Lime (UK) Mechanical Leader for the design of the Rapid Load |
E.L. Bateman |
1995 - 1996 |
|
|
Out Station System at Buxton Lime |
|
|
|
19 |
Programming of the computer simulation for analysis of the Belt Conveyors Discharge Trajectories |
Fluor Daniel Wright Ltd. |
1997 - 1998 |
|
based on the bulk materials dynamic characteristics |
|
|
|
|
|
|
|
Significant Inventions |
|
a. "Drive Means" (Intermediate booster-drive for very long or overloaded conveyors) |
|
b. "Truck Loading Means" (Super fast load out system for a railway tracks/wagon) |
|
c. "Method of Continous Discharge of the Railway Train" (non-stop tippler) |
|
|
|
|
|
PROJECT EXPERIENCES |
|
No. |
Description |
Client (s) |
Year (s) |
|
1 |
Project Management BoCT 3000 tph Upgrade |
PT. Indostraits |
Nov-06 |
|
2 |
Engineering Procurement Construction of Mechanical Installation BoCT 3000 tph upgrade |
PT. Indostraits |
Nov-06 |
|
3 |
Marine Consultancy Services FSO Inspection |
CNOOC |
Dec-06 |
|
4 |
Owners Representative |
Banpu PLC |
Jan-07 |
|
5 |
Jorong Dredging |
PT Jorong |
Jul-07 |
|
6 |
Marine Consultancy Services 2 Service Barges Inspection |
CNOOC |
Feb-07 |
|
7 |
Marine Consultancy Services 3 Drilling Barges Inspection |
CNOOC |
Feb-07 |
|
8 |
Marine Consultancy Services 4 Drilling Barges Inspection |
CNOOC |
Feb-07 |
|
9 |
Bontang 2 X 7 MW Coal Fired Power Plant |
PT. Indominco Mandiri |
Feb 2007 – June 2008 |
|
10 |
Marine Consultancy Services 5 Drilling Barges Inspection (Toba 2nd Inspection) |
CNOOC |
Mar-07 |
|
11 |
Technical Assistant to investigate the Palimindo Perkasa Crane Incident |
CNOOC |
May-07 |
|
12 |
Marine Consultancy Services 8 Drilling Barges Inspection (Pelangi Bravo) |
CNOOC |
May-07 |
|
13 |
Marine Consultancy Services 6 Drilling Barges Inspection |
CNOOC |
Jul-07 |
|
14 |
Gravity Dolphin Removal & Installation of Protection Beam |
PT. Jorong |
Jul-07 |
|
15 |
Marine Consultancy Services 9 Drilling Barges Inspection (3rd Pelangi Bravo inspection) |
CNOOC |
2007 |
|
16 |
Marine Consultancy Services 10 Drilling Barges Inspection (4th Pelangi Bravo inspection) |
CNOOC |
2007 |
|
17 |
Marine Consultancy Services/Representative |
SMI |
2007 |
|
18 |
Marine Consultancy Services 11 Drilling Barges Inspection (5th Pelangi Bravo Inspection) |
CNOOC |
2007 |
|
19 |
Marine Consultancy Services 12 Drilling Barges Inspection (4th Palmindo Perkasa Inspection) |
CNOOC |
2007 |
|
20 |
Marine Consultancy Services 13 Drilling Barges Inspection (5th Palmindo Perkasa Inspection) |
CNOOC |
2007 |
|
21 |
Assembly and Commission of LHM 500 crane |
Liebherr |
Aug-07 |
|
22 |
Engineering Procurement Construction of a flat top barge conversion into accomodation work over crane barge |
PT. Indominco Mandiri |
Aug-07 |
|
23 |
Maintenance Service for LHM 500 |
PT. Indominco Mandiri |
Oct 2007 - Sept 2009 |
|
24 |
Bontang Coal Terminal Upgrade Project Construction of Conveyor C31 |
PT. Indominco Mandiri |
2006 - Dec 2007 |
|
25 |
General Scoping Study on the EKCP (East Kutai Coal Project) |
Churchill Mining PLC |
Mar - May 2008 |
|
26 |
Marine Consultancy Services for MV. Golden Jaguar Salvage |
CNOOC |
Sep-09 |
|
27 |
Preliminary Engineering Design for Marangkayu Coal Terminal Project |
PT. Getra Kaltim Sejahtera |
Jul - Nov 2008 |